Build the right installation system
Select the project first. Coverage estimates will appear on eligible adhesive and finish products after you enter the area.
Check underlayment requirements, transitions, and stair details.
Plan adhesive, substrate preparation, finish protection, and transitions.
Confirm panel type, substrate, adhesive, layout, and ceiling suitability.
Product instructions control. Ask us to verify unusual substrates, wet areas, radiant heat, ceilings, or commercial assemblies.
Finishes
POLYURETHANE COATING
One item covers up to 750 sq. ft.
POLYURETHANE COATING
RigoStep (Royl) Step 1K CORK Transparent Litre (Polyurethane)
One item covers up to 130 sq. ft.
POLYURETHANE COATING
RigoStep (Royl) Step 1K CORK Transparent 4 Litre (Polyurethane)
One item covers up to 500 sq. ft.
POLYURETHANE COATING
One item covers up to 600 sq. ft.
POLYURETHANE COATING
One item covers up to 150 sq. ft.
Adhesives
CORK ADHESIVES
One item covers up to 34 sq. ft.
CORK ADHESIVES
One item covers up to 200 sq. ft.
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
T-Moldings
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing
Stair Nosing

