Special order item; takes approximately 2 weeks to produce; will ship with your order complete. No Return or Exchange.
To install T-Molding, you will need certain tools such as measuring tape, miter saw or power saw, construction adhesive, caulk gun, and a damp cleaning cloth.
Step 1: Start by measuring the width of the doorway between the floors, and use a miter saw or power saw for a cleaner cut.
Step 2: Apply construction adhesive along the bottom of the gap between the two floors.
Step 3: Press the T-molding into the gap firmly, ensuring that the top of the molding rests firmly on each floor with no gaps. Do not glue the lips to the floor.
Step 4: Wipe away any excess glue with a damp cloth.
Step 5: Weigh down the molding with a few heavy objects overnight, taking care not to create any tripping hazards.
Step 6: Apply Loba AT